The steeple on Christ the King Lutheran church was damaged by hail this summer. The steeple was removed with a crane in order to repair it and allow the roof to also be repaired. The photos in this gallery show how things went.
08-VH6427 Workers being raised in a “Personnel Basket”.
08-VH6427 Workers being raised in a “Personnel Basket”.